Project: Doha North Sewage Treatment Plant.
Location: 25km from Doha, Qatar.
Process:  Stage 1: Screening; Grit Removal;
Stage 2: Biological Treatment; Clarification; Sedimentation;
Stage 3: Multimedia (Granular) Filtration; Ultrafiltration; UV Disinfection.
Influent: Domestic and Industrial Wastewater from a population of approximately 900,000 (by 2020), in Doha and neighbouring suburbs.
Capacity:  250 Megalitres per Day (MLD).
Cost: Approximately US$1.7 billion.

History:
As a result of population increases in and around Doha, Qatar, and the need for improved wastewater treatment, the Public Works Authority of Doha awarded, in 2007, a “Build Own Operate” (“BOO”) Contract to Keppel Seghers Engineering, Singapore.

After Cost/Benefit and technical evaluations, C&S Brand Australian Filter Coal, was preferred for incorporation in the Multi-media Granular Filters.

James Cumming & Sons Pty Ltd supplied 2,800 cubic metres of C&S Brand Australian Filter Coal, Effective Size = 1.5 – 1.6mm, Uniformity Coefficient 1.4 maximum, for this project. The product was delivered on time, and wholly within specification.

The plant commenced operation in December 2015 – January 2016.

    • Categories: Filter Coal